News

Jiangsu Xinxin Electric Co., Ltd.

How dry-type transformer wiring and outgoing line?


Release time:

2021-08-05

Dry-type transformer wiring mode has the following 5 steps: 1. Short-circuit the "input" and "output" terminals of the transformer to test the insulation resistance of the ground wire with a megohmmeter. When measured by 1000V megohmmeter, the resistance value is greater than 2M ohms. 2. The cross-sectional wiring of transformer input and output power lines shall meet the requirements of current value;

Dry-type transformer wiring has the following 5 steps:

1. Short-circuiting the "input" and "output" terminals of the transformer to test the insulation resistance with the ground wire with a megohmmeter. When measured by 1000V megohmmeter, the resistance value is greater than 2M ohms.

2. The cross-sectional wiring of transformer input and output power lines shall meet the requirements of current value;

2-2.5A/min2 current density configuration is appropriate.

3. The input and output three-phase power lines shall be connected to phase A, phase B and phase C respectively according to the bus color yellow, green and red of the transformer wiring board. The neutral zero line shall be connected with the neutral zero line of the transformer voltage regulator, and the grounding line shall be connected with the transformer shell (if the transformer organic box shall be connected with the ground line mark of the box)

Check the input and output lines to make sure they are correct.

4, the first no-load power, observe the test input and output voltage to meet the requirements.

At the same time, observe whether there is abnormal sound, ignition, odor and other abnormal phenomena inside the machine. If there is any abnormality, please disconnect the input power immediately.

5. When the no-load test is completed and normal, the load can be connected.


What are the low voltage outlet modes of dry type transformer?

1. Low-voltage standard enclosed busbar:

If enclosed busbar (also called plug-in busbar or intensive busbar duct) is selected for engineering wiring, the corresponding dry-type transformer can provide standard enclosed busbar terminals for convenient connection with external busbar.

For products with enclosure (IP20), enclosed busbar flange is provided on the top cover of the enclosure; for products without enclosure (IP00), only enclosed busbar terminals are provided.

2. Low voltage standard horizontal row side outgoing line:

When the dry-type transformer and the low-voltage distribution panel are placed side by side, in order to facilitate the connection between their terminals, the transformer can provide low-voltage horizontal side outgoing lines, which are usually matched with GGD, GCK, MNS and other low-voltage panels. The transformer factory and the switch factory shall sign the interface matching minutes to confirm the detailed size of the matching interface to ensure smooth on-site installation.

3. Low voltage standard vertical row side outgoing line:

Similar to the horizontal row side outgoing line, when the busbar such as domino screen is selected as the vertical low-voltage distribution board, the transformer can provide the low-voltage vertical row side outgoing line.































 

Key words: